Precast Field Erection
Structural and architectural precast erected by PCI Certified crews — parking structures, data centers and architectural cladding — with crane coordination, site logistics and sequencing under one contract.
Request a QuotePrecast Erection for GCs, CMs and Precasters
HSE erects structural and architectural precast for general contractors, construction managers and precast producers: double tees, spandrels, columns and wall panels; insulated and architectural panels; large-panel cladding systems. On High-furnished projects we coordinate directly with High Concrete Group, so the producer and the erector are one family and one chain of accountability.
- PCI Certified Erector — Categories A and S2
- PCI Certified Field Auditors on staff
- Crane coordination and site logistics
- Direct coordination with High Concrete Group on High-furnished projects
Parking Structures
Double tees, spandrels, columns, shear walls and stair towers erected level by level on the tightest sites an owner has — hospital campuses, downtown blocks, live parking lots — the way HSE built the Penn State Health Hershey parking garage.
- Double tees, spandrels, columns and wall panels
- Stair and elevator towers, brick-inlay and architectural spandrels
- Level-by-level sequencing so following trades start early
Data Centers
Structural precast, architectural panels and insulated wall panels that close the envelope fast, so the mechanical and electrical fit-out that defines a data center schedule can start — erection sequenced around the energization date and the site’s other trades.
- Structural and architectural precast under one field crew
- Insulated and architectural precast wall panels
- Schedule-sensitive sequencing around the energization date
Architectural Cladding & Institutional Buildings
Architectural precast cladding and large-panel systems for commercial, institutional and industrial buildings, set to the tolerances the architect drew and coordinated with the precaster, GC, engineer and owner.
- Architectural precast cladding and large-panel erection
- Commercial, institutional and industrial buildings
- PCI Category A — Architectural Systems
Site Logistics, Cranes & Sequencing
Large panel counts on constrained sites need delivery, laydown and crane planning as carefully as the picks themselves. HSE plans deliveries, crane positioning and crew rotation with the GC or CM before the first truck arrives, then holds the plan.
- Crane selection and positioning by HSE
- Just-in-time delivery and laydown planning
- Erection sequencing planned with the GC, CM and precaster
What Comes With the Crew
The certifications a precaster, owner or GC asks for at prequalification, held in house.
PCI Certified Erector
Categories A (Architectural Systems) and S2 (Complex Structural Systems) — the scopes owners and precasters specify.
PCI Certified Field Auditors
Field auditors on staff, so erection quality is checked by our own people as the structure goes up.
Licensed Professional Engineers
In-house erection engineering, rigging design and lift planning. PE licensure in ten states.
Part of the High Family
High Concrete Group produces the precast; HSE erects it. One family, one chain of accountability on High-furnished projects.
Can We Help?
Have a parking structure, data center or precast building that needs a certified erection crew?
Send the plans or piece schedule with the let or bid date, location and any staging or MOT constraints — a link to your plan room or ITB works.