HSE provides full-scope erection services for precast parking structures across the Mid-Atlantic. Specializations involve structures with complex architectural finishes, rigging support for critical lifts, site laydown analysis, delivery timing, traffic constraints and field coordination.

Request a Quote
Certified field execution

Precast Parking Structure Erection

A precast garage is erected in one continuous sequence, columns, then beams, then tees, level by level, and the schedule is only as good as the coordination behind it. HSE erects total-precast parking structures for general contractors, owners and precast producers, coordinating delivery, crane position and connection work so each level closes before the next one starts. Recent work includes the 1,235-space total-precast garage at Penn State Health Hershey Medical Center, where HSE is named as the PCI Certified Erector, and the Marquis parking structure in Easton, Pennsylvania.

  • PCI Certified Erector, Categories A and S2
  • Total-precast parking structures, level-by-level sequencing
  • Coordination with High Concrete Group on High-furnished projects
  • Self-performing in PA, NY, DE, MD and VA
View Parking Projects
Multi-level precast parking structure under construction

Double Tees, Beams & Columns

The structural frame, columns set and plumbed, inverted tee and L-beams landed, double tees flown and connected. Bearing pads, weld plates and topping interfaces are checked as the deck goes together, not after the crane leaves.

  • Columns, inverted tee and L-beams, double tees
  • Bearing pads, weld plates and field connections
  • Level-by-level erection sequencing
Request a Quote
Crane flying a precast double tee into a parking structure

Spandrels, Shear Walls, Stairs & Ramps

Spandrels doing structural restraint and façade duty at the same time, shear walls, stair and elevator cores, and ramp framing, the pieces that make a garage a building rather than a deck, and the ones with the least tolerance for a missed dimension.

  • Spandrels, shear walls, stair and elevator cores
  • Ramp framing and transition pieces
  • Architectural finishes protected through erection
Request a Quote
Precast parking structure erected beside an office building under construction

What Comes With the Crew

The certifications a GC, owner or precaster asks for at prequalification, held in house.

PCI Certified Erector A & S2

Architectural Systems and Complex Structural Systems, the top structural category.

PCI Certified Field Auditors

CFA on staff, quality audited by our own people.

Licensed Professional Engineers

Erection engineering, rigging design and lift planning in house. PE licensure in ten states.

Part of the High Family

High Concrete Group precast and High Transit heavy haul, casting bed to final connection under one family.

Can We Help?