Bridge Steel Repair & Erection in New York and Delaware
Emergency girder repair, heat straightening and bridge steel erection, including NYSDOT Red Flag response.
Request a QuoteNew York, Red Flag Response
NYSDOT Red Flag emergency girder repair, Westchester County. After significant impact damage to a steel girder, HSE provided heat-straightening supervision and steel repair as part of an emergency Red Flag response with Harrison & Burrowes Bridge Constructors.
A Red Flag is NYSDOT’s designation for a structural condition serious enough that the owner is notified immediately and has to act on it. It usually puts the owner in front of a single choice: replace the member, or restore it. This girder was restored without a full member replacement, and the structure returned to service with minimal disruption to traffic.
- Controlled heat straightening, restraint, repair, inspection and testing
- Licensed Professional Engineers registered in New York
- Emergency mobilization, call 717.390.4200
Delaware
I-95 Christina River Bridge, Wilmington. Bridge steel erection on the Christina River crossing, delivered as an advance project within DelDOT’s I-95 corridor programme through Wilmington.
Delaware sits inside a comfortable mobilization radius of Lancaster, which matters on corridor work where the traffic windows are short and the staging areas are tight.
- DelDOT corridor and river crossing work
- Staged erection under live interstate traffic
- Licensed Professional Engineers on staff
Setting Girders Over the Christina River
Erecting over a navigable river changes the whole approach. Access, river traffic and tide, and a crane that cannot simply reposition all have to be resolved in the erection plan before the first pick, and the plan has to survive a delivery arriving late or a lift that does not go as drawn.
- Girder erection over water on an active interstate crossing
- Overnight windows and short stage changes rather than long closures
- Erection engineering and rigging plans prepared in house
The corridor above decides the schedule. I-95 through Wilmington carries the length of the Eastern Seaboard through a single urban mile, so the work is written into the hours the road can spare.
I-95 Christina River Bridge
Repair Instead of Replacement
Replacing an impact-damaged member means new steel, new lead time and a longer closure. Controlled heating patterns and restraint return the member to shape in place, documented and inspected, and the structure goes back into service sooner and for less.
- Heat straightening, structural restraint, steel repairs, inspection and testing
- Repair procedures and temporary support designed by HSE’s own PEs
- Emergency mobilization across New York and Delaware

What We Self-Perform
HSE is a subcontractor. Owners, authorities and general contractors bring us in for the steel scope and the engineering that goes with it.
- Bridge steel erection, highway, rail and pedestrian
- Bridge rehabilitation: jacking, towers and falsework, bearing replacement, welded and bolted repair, strongbacks
- Heat straightening and emergency response to girder strikes
- Precast field erection
Working in New York or Delaware?
Send us the plans and we will tell you how we would erect it.